Kent, Bob, Tony, and Gene:

Kent: I have attached revision A of the LAN Implementation Form.  My
answers are given in red font.  Please go through my answers and add
additional detail as you deem appropriate.  I rack mounted the OS10K
Friday (see Figure 1).

Bob: I'd like to work with you on Monday to mount one OS6900 in CSL-121A
and one OS6900 in EBA-111.  I met Eric Frost and he has given us
permission to mount an OS6900 in CSL-121A.  We need to ensure water
doesn't leak onto the OS6900 through the fiber conduit in the event of a
rainstorm (Eric mentioned this issue).  We also need to connect SMF to
the SFP-10G-LR ports 1 and 2 in the NI slot 1 module (see Figure 2) that
connect back to X2-LR GBICS in Te1/2 and Te1/3 of the CENIC C4900M
switch sd-csu-sw-3 in Admin 12.

Tony: Network 130.191.49.0/24 is now associated with Autonomous System
Number 64760.

Gene: I have included an updated Science DMZ Network Internal Firewall
Ruleset in section 5.

Thanks everyone,

Chris


-- 
This message has been scanned for viruses and
dangerous content by MailScanner, and is
believed to be clean.

-------------- next part --------------
A non-text attachment was scrubbed...
Name: ALU-LAN-Req Science DMZ rev A.docx
Type: application/x-zip
Size: 3328216 bytes
Desc: not available
URL: <http://engineering.sdsu.edu/pipermail/sciencedmz/attachments/20130504/fd93c088/attachment-0002.bin>
-------------- next part --------------


Witt, Brian K (Brian) <brian.witt at alcatel-lucent.com> wrote:

>    Hi Chris and All-
> 
> 
>    The meeting agenda includes a pretty standard set of readiness
>    checklist items.  These are repeated below.
> 
> 
>    Site readiness
> 
>    -          Un Box and Rack the equipment.
> 
>    -          Confirm power sources.
> 
>    -          Confirm that they have the 10G Connections to the Cisco box
>    that goes to the internet and the appropriate cables.
> 
>    -          Confirm that they have the cable connections to the two
>    6900's and their file servers.
> 
>    -          Confirm all cables have the right connectors.
> 
>    Information needed for design and configuration of the OS10K and two
>    6900s
>    (i.e. logical design / configuration - needed by the time PS Engineer
>    is on-site)
> 
>    -          Physical port plan
> 
>    -          VLAN plan
> 
>    -          Subnet Plan
> 
>    -          System parameters (NMS, NTP, .....)
> 
>    -          Security/ACL intentions
> 
> 
>    The attached word document covers the same ground and I will use this
>    form to capture our discussion and any open points.
> 
> 
>    Best Regards,
> 
> 
> 
> 
>    Brian Witt
>    Solution Engineer
>    ACPS IP Networking, AQPS Voice
> 
>    CWNP:  CWDP, CWSP, CWAP
> 
>    Western Region
>    M: +1 949 278 8957
>    brian.witt at alcatel-lucent.com
> 
>    AL_Enterprise_logo_CMYK
> 
> 
> 
>    http://enterprise.all.alcatel-lucent.com/private/internal_docs/DYK-emai
>    l-banner-20.jpg
> 
> 
> 
>    --
>    This message has been scanned for viruses and
>    dangerous content by MailScanner, and is
>    believed to be clean.


More information about the sciencedmz mailing list