[sciencedmz] Science DMZ - installation requirements checkpoint
Christopher Paolini
paolini at engineering.sdsu.edu
Sat May 4 18:14:01 PDT 2013
Kent, Bob, Tony, and Gene:
Kent: I have attached revision A of the LAN Implementation Form. My
answers are given in red font. Please go through my answers and add
additional detail as you deem appropriate. I rack mounted the OS10K
Friday (see Figure 1).
Bob: I'd like to work with you on Monday to mount one OS6900 in CSL-121A
and one OS6900 in EBA-111. I met Eric Frost and he has given us
permission to mount an OS6900 in CSL-121A. We need to ensure water
doesn't leak onto the OS6900 through the fiber conduit in the event of a
rainstorm (Eric mentioned this issue). We also need to connect SMF to
the SFP-10G-LR ports 1 and 2 in the NI slot 1 module (see Figure 2) that
connect back to X2-LR GBICS in Te1/2 and Te1/3 of the CENIC C4900M
switch sd-csu-sw-3 in Admin 12.
Tony: Network 130.191.49.0/24 is now associated with Autonomous System
Number 64760.
Gene: I have included an updated Science DMZ Network Internal Firewall
Ruleset in section 5.
Thanks everyone,
Chris
--
This message has been scanned for viruses and
dangerous content by MailScanner, and is
believed to be clean.
-------------- next part --------------
A non-text attachment was scrubbed...
Name: ALU-LAN-Req Science DMZ rev A.docx
Type: application/x-zip
Size: 3328216 bytes
Desc: not available
URL: <http://engineering.sdsu.edu/pipermail/sciencedmz/attachments/20130504/fd93c088/attachment-0002.bin>
-------------- next part --------------
Witt, Brian K (Brian) <brian.witt at alcatel-lucent.com> wrote:
> Hi Chris and All-
>
>
> The meeting agenda includes a pretty standard set of readiness
> checklist items. These are repeated below.
>
>
> Site readiness
>
> - Un Box and Rack the equipment.
>
> - Confirm power sources.
>
> - Confirm that they have the 10G Connections to the Cisco box
> that goes to the internet and the appropriate cables.
>
> - Confirm that they have the cable connections to the two
> 6900's and their file servers.
>
> - Confirm all cables have the right connectors.
>
> Information needed for design and configuration of the OS10K and two
> 6900s
> (i.e. logical design / configuration - needed by the time PS Engineer
> is on-site)
>
> - Physical port plan
>
> - VLAN plan
>
> - Subnet Plan
>
> - System parameters (NMS, NTP, .....)
>
> - Security/ACL intentions
>
>
> The attached word document covers the same ground and I will use this
> form to capture our discussion and any open points.
>
>
> Best Regards,
>
>
>
>
> Brian Witt
> Solution Engineer
> ACPS IP Networking, AQPS Voice
>
> CWNP: CWDP, CWSP, CWAP
>
> Western Region
> M: +1 949 278 8957
> brian.witt at alcatel-lucent.com
>
> AL_Enterprise_logo_CMYK
>
>
>
> http://enterprise.all.alcatel-lucent.com/private/internal_docs/DYK-emai
> l-banner-20.jpg
>
>
>
> --
> This message has been scanned for viruses and
> dangerous content by MailScanner, and is
> believed to be clean.
More information about the sciencedmz
mailing list