[Faculty] Temporary Interruption of HVAC Chilled Water at Engineering Building - Tomorrow (Thursday 06/04/20)

Kara Peterson kara.peterson at sdsu.edu
Wed Jun 3 16:02:29 PDT 2020


Hi to all,

We will be performing a *temporary shutdown of the Engineering Building
HVAC chilled water tomorrow (Thursday, 06/04/20).*

The shutdown is necessary to tie in the new chilled water piping installed
at the Engineering Building roof as part of the "Heating Hot Water"
project.

The shutdown will take place from *7:00 AM to approximately 5:00 pm. *

During this time, you may notice warmer than usual temperatures in the
building.
No lab equipment will be affected by this shutdown.

Let me know if you have any questions or would like more information. For
those who are interested, a step-by-step process is detailed in the
attached document.

*Kara Peterson, **Construction Program Manager*

San Diego State University│Planning, Design & Construction
5500 Campanile Drive, San Diego, CA 92182
619-594-6930 (o)│619-459-7477 (c)
kara.peterson at sdsu.edu
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://engineering.sdsu.edu/pipermail/faculty/attachments/20200603/cfccca47/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: HHW - CW tie in at Engineering Building.pdf
Type: application/pdf
Size: 10326738 bytes
Desc: not available
URL: <http://engineering.sdsu.edu/pipermail/faculty/attachments/20200603/cfccca47/attachment-0001.pdf>


More information about the Faculty mailing list