This morning I walked the floors with the contractors and we looked in
every office/lab on the 3rd and 4th floors to check for water
leaks/damage. If there is any additional damage to report that is not
currently being addressed, please contact Kat Marian at x4-0250 or
kmarian at mail.sdsu.edu.
Thank you,
Marcie Morihiro
Assistant to the Dean
College of Engineering
San Diego State University
5500 Campanile Drive
San Diego, CA 92182-1326
Office: E-203B
Phone: 619-594-6062
E-mail: mmorihiro at mail.sdsu.edu
On Mon, Nov 21, 2016 at 10:29 AM, Amanda Scheidlinger <
ascheidlinger at mail.sdsu.edu> wrote:
> Good Morning Marcie,
>
>
>
> Our department is aware of the leaks at the Engineering Building, and I
> want to stress to you we’re working diligently to get the areas both dry
> and usable for classes in the near future.
>
>
>
> Until we come up with a permanent fix, we are in the process of using the
> following temporary measures:
>
>
>
> -We’ve enlisted a full service restoration/remediation
> contractor (ATI Restoration) and they have fans onsite and are opening up
> walls to facilitate drying.
>
> -The General Contractor is in the process of drying-in the
> roof again to avoid any potential future leaks.
>
> -We’ve contacted EH&S to visit the rooms in question and
> provide guidance & advise on any future remediation requirements.
>
> -O’Connor Construction Management is taking photographs of the
> damage, and they are removing ceiling tiles to assess any damage that may
> not be evident yet.
>
> -I’ve contacted our CSU Insurance Company, and they’ll be
> sending out a claims representative to assess the damage.
>
> -We will continue to monitor the areas in the coming weeks to
> identify any future issues related to this water damage.
>
>
>
> We are currently speaking with our General Contractor to identify the
> cause of all of these leaks. We believe the cause came from a faulty seal
> at the roof penetrations, but this will be confirmed in the coming days. We
> sincerely apologize for any inconvenience this has caused, and will be
> working day and night to get this fixed.
>
>
>
> If you have any additional damage to report, please contact Kat Marian at
> 4-0250 or kmarian at mail.sdsu.edu.
>
> Thanks,
>
> Amanda
>
>
>
> *Amanda Scheidlinger, AIA, DBIA, LEED AP BD+C*
>
> Facilities Planning, Design and Construction
>
> [image: Description: Description: cid:image001.jpg at 01CE3B69.164C7F40]
>
>
>
> 619-594-3740
>
> ascheidlinger at mail.sdsu.edu
>
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://engineering.sdsu.edu/pipermail/faculty/attachments/20161121/47230b99/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 2706 bytes
Desc: not available
URL: <http://engineering.sdsu.edu/pipermail/faculty/attachments/20161121/47230b99/attachment-0001.jpg>
More information about the Faculty
mailing list