<div dir="ltr">Hi Everyone,<div><br></div><div>Just a final reminder regarding the Power Outage that will take place 12/31/16-1/2/17 as follows:</div><div><br></div><div><p class="MsoNormal"><font face="arial, helvetica, sans-serif"><span style="font-size:10pt"><font color="#000000"><u>The outage times for all buildings listed below, will be</u>:</font></span><u></u><u></u></font></p><p class="MsoNormal"><span style="font-size:10pt"><font face="arial, helvetica, sans-serif"><br></font></span></p><p class="MsoNormal"><font face="arial, helvetica, sans-serif"><b><span style="font-size:10pt">Saturday, December 31<sup>st</sup>, from 6am to 12pm </span></b><u></u></font></p><p class="MsoNormal"><font face="arial, helvetica, sans-serif"><b><span style="font-size:10pt">Monday, January 2<sup>nd</sup>, from 9am to 3pm</span></b><u></u><u></u></font></p><p class="MsoNormal"><font face="arial, helvetica, sans-serif"><span style="font-size:10pt"> </span><u></u><u></u></font></p><p class="MsoNormal"><span style="font-size:10pt"><font face="arial, helvetica, sans-serif">Aside from the times listed above, power will be ON & available to all buildings during this outage.</font></span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"><br></span></p><p class="MsoNormal"><span style="font-size:10pt"><font face="arial, helvetica, sans-serif"><u>In preparation for the Power Outage</u>:</font></span></p><p class="MsoNormal"><span style="font-size:10pt"><font face="arial, helvetica, sans-serif"><br></font></span></p><div>1) Please make sure that you defrost freezers in your personal refrigerators. As well, please remove any food that may spoil during the outage.</div><div><br></div><div>2) The elevators in all buildings affected by the power outage (including Engineering), will be non-operational for the full 3-days. </div><div><br></div><div>Thank you!</div><div><div class="gmail_signature"><div dir="ltr">Marcie Morihiro<br>Assistant to the Dean<br>College of Engineering<br>San Diego State University<br>5500 Campanile Drive<br>San Diego, CA 92182-1326<br><br>Office: E-203B<br>Phone: 619-594-6062<br>E-mail: <a href="mailto:mmorihiro@mail.sdsu.edu" target="_blank">mmorihiro@mail.sdsu.edu</a><br></div></div></div>
<br><div class="gmail_quote">---------- Forwarded message ----------<br>From: <b class="gmail_sendername">Marcie Morihiro</b> <span dir="ltr"><<a href="mailto:mmorihiro@mail.sdsu.edu">mmorihiro@mail.sdsu.edu</a>></span><br>Date: Fri, Dec 16, 2016 at 12:10 PM<br>Subject: Fwd: REMINDER - Substation A Power Outage - 12/31/16 - 1/2/17<br>To: faculty <<a href="mailto:faculty@engineering.sdsu.edu">faculty@engineering.sdsu.edu</a>>, <a href="mailto:staff@engineering.sdsu.edu">staff@engineering.sdsu.edu</a><br><br><br><div dir="ltr">Hi Everyone,<div><br></div><div>I'm following up with a couple of additional items regarding the Power Outage e-mail below:</div><div><br></div><div>1) Please make sure that you defrost freezers in your personal refrigerators. As well, please remove any food that may spoil during the outage.</div><div><br></div><div>2) The elevators in all buildings affected by the power outage (including Engineering), will be non-operational for the full 3-days. </div><div><br></div><div>Thank you!</div><div><div><div class="gmail-m_3735538756305336890gmail_signature"><div dir="ltr">Marcie Morihiro<br>Assistant to the Dean<br>College of Engineering<br>San Diego State University<br>5500 Campanile Drive<br>San Diego, CA 92182-1326<br><br>Office: E-203B<br>Phone: <a href="tel:(619)%20594-6062" value="+16195946062" target="_blank">619-594-6062</a><br>E-mail: <a href="mailto:mmorihiro@mail.sdsu.edu" target="_blank">mmorihiro@mail.sdsu.edu</a><br></div></div></div>
<br><div class="gmail_quote">---------- Forwarded message ----------<br>From: <b class="gmail_sendername">Amanda Scheidlinger</b> <span dir="ltr"><<a href="mailto:ascheidlinger@mail.sdsu.edu" target="_blank">ascheidlinger@mail.sdsu.edu</a>></span><br>Date: Fri, Dec 16, 2016 at 11:52 AM<br>Subject: REMINDER - Substation A Power Outage - 12/31/16 - 1/2/17<br>To: <br><br><br><div dir="ltr"><span style="font-family:arial,helvetica,sans-serif"><span style="font-size:10pt;color:rgb(89,89,89)"><b>To: </b>All SDSU Faculty and Staff</span></span><br><div class="gmail_quote"><span style="font-family:arial,helvetica,sans-serif"><span style="font-size:10pt;color:rgb(89,89,89)"></span></span><div dir="ltr"><span style="font-family:arial,helvetica,sans-serif"><span style="font-size:10pt;color:rgb(89,89,89)"><b>From:</b> Amanda Scheidlinger, Facilities Planning, Design and Construction<br><b>Subject:</b> REMINDER - Substation A Power Outage - 12/31/16 - 1/2/17<br><br></span></span><div><div><div><div class="gmail_quote"><div lang="EN-US"><div class="gmail-m_3735538756305336890m_-3435871438454817618gmail-m_80434872729821447gmail-m_6484571986834813467WordSection1"><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"><u></u> <u></u></span></p><p class="MsoNormal"><b><span style="font-size:10pt;font-family:"century gothic",sans-serif">***REMINDER*** Power Outage for Substation A is scheduled from December 31<sup>st</sup> – January 2<sup>nd</sup>. <u></u><u></u></span></b></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"><u></u> <u></u></span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">During this outage, all buildings supported by <i>Substation A</i> will receive temporary power via a large temporary generator.</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"> </span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">However, the connection of this temporary generator will cause two 6-hour outages where power will be out to ALL campus buildings listed below.</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"> </span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">We are in the process of arranging for temporary local generators to maintain power to any mission critical research facilities and/or data centers that cannot sustain these 6-hour outages. We believe we have identified these areas, but please let me know if you believe your equipment cannot survive being turned off for 6 hours at time.</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"> </span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Emergency generators will continue to provide power to life safety devices (and any other equipment they already support) during this time. </span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"> </span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">The outage times for all buildings listed below, will be:</span><u></u><u></u></p><p class="MsoNormal"><b><span style="font-size:10pt;font-family:"century gothic",sans-serif">Saturday, December 31<sup>st</sup>, from 6am to 12pm </span></b><i><span style="font-size:10pt;font-family:"century gothic",sans-serif">(Please note this has been moved forward 1 hour from the last outage email)</span></i><u></u><u></u></p><p class="MsoNormal"><b><span style="font-size:10pt;font-family:"century gothic",sans-serif">Monday, January 2<sup>nd</sup>, from 9am to 3pm</span></b><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"> </span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Aside from the times listed above, power will be ON & available to all buildings during this outage.</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"> </span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">The buildings affected by this outage are listed below (in alphabetical order):</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"> </span><u></u><u></u></p><p class="MsoNormal"><u><span style="font-size:10pt;font-family:"century gothic",sans-serif">BUILDING/LOCATION (Building No.)</span></u><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Administration (30)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Art North (56)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Art South (1)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Arts & Letters (90)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Bioscience Center (135)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Bookstore (45)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">CAM Center (22)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Charles Hostler Hall (E)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Chemical Sciences Laboratory*** (60)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">East Commons (32)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Education (6)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Engineering (19)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Facility Services (24)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Facility Services Cogen (25)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Faculty Staff Club (39)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Geography Annex (28)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Geology Mathematics Computer Sciences (3,3A)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Hardy Tower (26)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Hepner Hall (2)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Market/Starbucks (C)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Nasatir Hall (A)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">North Education (38)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">North Life Sciences (35)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Parking Lot 16 (All Buildings & Marquee)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Parking Structure 14</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Physical Sciences (17)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Physics (13)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Physics Astronomy (14)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Professional Studies & Fine Arts (27)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Quonset Huts (201)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">South Life Sciences (10)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Storm Hall (B)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">Storm Hall West (D)</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt"> </span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">We apologize for any inconvenience this outage may cause. If you have any questions or concerns, please contact Amanda Scheidlinger at <a href="tel:619-594-3740" target="_blank">619-594-3740</a> or at <a href="mailto:ascheidlinger@mail.sdsu.edu" target="_blank">ascheidlinger@mail.sdsu.edu</a>.</span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"> </span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"> </span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif">***Because CSL is on a different transformer than the rest of the buildings at Substation A, this building will be connected to a different temporary generator and may experience different outage times. I am working directly with occupants of this building in regards to this outage.</span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"> </span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"><u></u> <u></u></span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif"><u></u> <u></u></span></p><p class="MsoNormal"><b><span style="font-size:10pt;font-family:"century gothic",sans-serif;color:rgb(148,54,52)">Amanda Scheidlinger, AIA, DBIA, LEED AP BD+C<u></u><u></u></span></b></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif;color:rgb(89,89,89)">Facilities Planning, Design and Construction<u></u><u></u></span></p><p class="MsoNormal"><span style="color:rgb(84,141,212)"><img id="gmail-m_3735538756305336890m_-3435871438454817618gmail-m_80434872729821447gmail-m_6484571986834813467Picture_x0020_3" src="cid:image001.jpg@01D25787.613A2E10" alt="Description: Description: cid:image001.jpg@01CE3B69.164C7F40" height="31" border="0" width="157"></span><u></u><u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif;color:rgb(84,141,212)"> </span><span style="font-size:10pt;font-family:"century gothic",sans-serif"><u></u><u></u></span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif;color:rgb(89,89,89)"><a href="tel:%28619%29%20594-3740" value="+16195943740" target="_blank">619-594-3740</a><u></u><u></u></span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:"century gothic",sans-serif;color:rgb(89,89,89)"><a href="mailto:ascheidlinger@mail.sdsu.edu" target="_blank"><span style="color:rgb(89,89,89)">ascheidlinger@mail.sdsu.edu</span></a><u></u><u></u></span></p><p class="MsoNormal"><u></u> <u></u></p></div></div></div><br></div></div></div></div>
</div><br></div>
</div><br></div></div>
</div><br></div></div>