<div dir="ltr">Hi Everyone,<div><br></div><div>Just a reminder that the Engineering Roof Survey will be begin on Monday 2/1 and completion should be done by Friday 2/5. Please see e-mail below from SDSU <span style="font-size:12.8px">Facilities Planning, Design & Construction Dept, as well as the attached map of the locations that the roof survey will be taking place.</span></div><div><span style="font-size:12.8px"><br></span></div><div><span style="font-size:12.8px">Thank you!<br clear="all"></span><div><div class="gmail_signature"><div dir="ltr">Marcie Morihiro<br>Assistant to the Dean<br>College of Engineering<br>San Diego State University<br>5500 Campanile Drive<br>San Diego, CA 92182-1326<br><br>Office: E-203B<br>Phone: 619-594-6062<br>E-mail: <a href="mailto:mmorihiro@mail.sdsu.edu" target="_blank">mmorihiro@mail.sdsu.edu</a><br></div></div></div>
<br><div class="gmail_quote">---------- Forwarded message ----------<br>From: <b class="gmail_sendername">Kristi KAT Marian</b> <span dir="ltr"><<a href="mailto:kmarian@mail.sdsu.edu">kmarian@mail.sdsu.edu</a>></span><br>Date: Wed, Jan 27, 2016 at 4:19 PM<br>Subject: Engineering Roof: Existing Conditions Survey the week of 2/1/16<br>To: Marcie Morihiro <<a href="mailto:mmorihiro@mail.sdsu.edu">mmorihiro@mail.sdsu.edu</a>><br>Cc: Al Kirsininkas <<a href="mailto:akirsininkas@ocmi.com">akirsininkas@ocmi.com</a>>, Steve Hilton <<a href="mailto:shilton@kitchell.com">shilton@kitchell.com</a>>, Work Control Physical Plant <<a href="mailto:wcontrol@mail.sdsu.edu">wcontrol@mail.sdsu.edu</a>>, Chad Dragan <<a href="mailto:cdragan@mail.sdsu.edu">cdragan@mail.sdsu.edu</a>><br><br><br><div lang="EN-US" link="blue" vlink="purple"><div><p class="MsoNormal"><b>Dear Marcie,<u></u><u></u></b></p><p class="MsoNormal">Enclosed is a map that shows proposed 10-areas on the Engineering roof where the drilling will take place. We are conservatively estimating that whole week is required for the survey, staring Mon 2/1 and completing Fri 2/5. The contractor will start work on Mon 2/1 at 8:30 am and on following days earlier ~6 - 7 am. No electrical, plumbing or HVAC shutdown is expected or anticipated. We do anticipate noises and possible air-borne dust from drilling and back-filling the holes in the roof. <u></u></p><p class="MsoNormal"><u></u> <u></u></p><p class="MsoNormal">Thank you in advance, Kat<u></u><u></u></p><p class="MsoNormal"><u></u> <u></u></p><p class="MsoNormal"><span style="font-size:10pt;font-family:Arial,sans-serif">Kristi ‘<b>Kat</b>’ Marian, University Planner<u></u><u></u></span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:Arial,sans-serif;color:gray">SDSU <i>Facilities Planning, Design & Construction<u></u><u></u></i></span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:Arial,sans-serif;color:gray">5500 Campanile Drive, San Diego, CA 92182-1624<u></u><u></u></span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:Arial,sans-serif;color:gray">p <a href="tel:619-594-0250" value="+16195940250" target="_blank">619-594-0250</a> m <a href="tel:619-578-3515" value="+16195783515" target="_blank">619-578-3515</a><u></u><u></u></span></p><p class="MsoNormal"><u></u> <u></u></p></div></div></div><br></div></div>