<div dir="ltr">To Engineering Faculty and Staff:<div><br></div><div>Several of you inquired about the accessibility to the Engineering Building and requested further details. I am forwarding you an email I received from Facilities Services that I hope provides you with answers to your questions. </div>

<div><br></div><div>Thanks,</div><div><br></div><div>Monte<br><br><div class="gmail_quote">---------- Forwarded message ----------<br>From: <b class="gmail_sendername">Marc Culver</b> <span dir="ltr"><<a href="mailto:mculver@mail.sdsu.edu">mculver@mail.sdsu.edu</a>></span><br>

Date: Tue, Dec 17, 2013 at 5:46 AM<br>Subject: Re: Renovation of the 2nd floor corridors<br>To: Monte Mehrabadi <<a href="mailto:mehrabadi@sdsu.edu">mehrabadi@sdsu.edu</a>><br>Cc: David Hamilton <<a href="mailto:david@adccorp.com">david@adccorp.com</a>><br>

<br><br>Thank you for the Dept. notification. To be more specific the week of 12-23 / 29, the majority of the renovation will take place during regular working hours and the 2nd floor will be closed. Starting Monday the 30th there may be some construction environments during the days but full access to the building will be open. Work to be complete will take place off hours or in an isolated and confined area which shouldn't  affect the occupants. I gave the extended date of 1-17-14 for long lead items but the renovation for the most part will be done by 1-6-14. The abatement starting this Friday is still accurate.<br>


<br>
Sent from my iPad<br>
<div class="im HOEnZb"><br>
> On Dec 16, 2013, at 3:32 PM, Monte Mehrabadi <<a href="mailto:mehrabadi@sdsu.edu">mehrabadi@sdsu.edu</a>> wrote:<br>
><br>
> To Engineering Faculty and Staf<br>
><br>
</div><div class="HOEnZb"><div class="h5">> The renovation of the 2nd floor corridors of the Engineering Building will begin at the end of this week and will conclude on the first day of the Spring semester on January 17th.<br>


><br>
> The asbestos abatement of the floor will begin at 10:00PM on Friday, December 20th and ends at 8:00AM on Monday, December 23rd.  The building will be closed during this period.<br>
><br>
> From December 23 to January 17, there will be limited access to the 2nd floor but other floors will be accessible.<br>
><br>
> Please let me and Marcie know if you have any questions, or concerns.<br>
><br>
> Thanks,<br>
><br>
> Monte</div></div></div></div></div>
<br />-- 
<br />This message has been scanned for viruses and
<br />dangerous content by
<a href="http://www.mailscanner.info/"><b>MailScanner</b></a>, and is
<br />believed to be clean.