<div dir="ltr">Hi Everyone,<div><br></div><div>While the construction team was taking down the green screening from the SP 103 parking fencing, a faculty or staff member asked if they could have the material. The construction team has placed the fencing material against the Engineering building, facing Aztec Circle Drive.</div><div><br></div><div>If the material is not claimed and moved by close of business Wednesday, 4/26, it will be thrown out.</div><div><br></div><div>Thank you, </div><div><div><div><div class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr">Marcie Morihiro<br>Assistant to the Dean<br>College of Engineering<br>San Diego State University<br>5500 Campanile Drive<br>San Diego, CA 92182-1326<br><br>Office: E-203B<br>Phone: 619-594-6062<br>E-mail: <a href="mailto:mmorihiro@mail.sdsu.edu" target="_blank">mmorihiro@mail.sdsu.edu</a><br></div></div></div>
</div></div></div>