<div dir="ltr">Hi Everyone,<div><br></div><div>Facilities Services (FS) came by earlier this afternoon and there is an issue with a large section of the main water pipe that runs under the 4th floor and will need to be replaced. Due to the large scale repair, they will not be able to start until Spring Break.</div><div><br></div><div>FS tried multiple times to replicate the leak, turning on all of the faucets in each of the labs on the 4th floor, sinks in the bathrooms, etc, but no leak occurred on the 3rd floor.</div><div><br></div><div>As a safety precaution, FS is going to keep the 4th floor bathrooms closed until the work on the pipe is complete. They have said it is okay to utilize the sinks in E-420 & E-422.</div><div><br></div><div>For Explore SDSU, our guests will need to utilize the restrooms on the 1st, 2nd and 3rd floors.</div><div><br></div><div>The water "net"and tubing currently suspended from the 3rd floor ceiling will be removed later this evening before our guests arrive for Explore SDSU.</div><div><br></div><div>I will continue to keep you posted on the start date of the pipe repair.</div><div><br></div><div>If you notice any leaks, please let me know immediately. For after hours, please call Facilities Services: 619-594-4754, hit '0' for the Operator and they will make an emergency call to a member of the Facilities Services Department.</div><div><br></div><div>Thank you!</div><div><div class="gmail_extra"><br clear="all"><div><div class="gmail_signature"><div dir="ltr">Marcie Morihiro<br>Assistant to the Dean<br>College of Engineering<br>San Diego State University<br>5500 Campanile Drive<br>San Diego, CA 92182-1326<br><br>Office: E-203B<br>Phone: 619-594-6062<br>E-mail: <a href="mailto:mmorihiro@mail.sdsu.edu" target="_blank">mmorihiro@mail.sdsu.edu</a><br></div></div></div>
<br><div class="gmail_quote">On Thu, Mar 17, 2016 at 5:02 PM, Marcie Morihiro <span dir="ltr"><<a href="mailto:mmorihiro@mail.sdsu.edu" target="_blank">mmorihiro@mail.sdsu.edu</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="ltr">Hi Everyone,<div><br></div><div>Facilities Services (FS) came out and assessed the problem of the leak on the 3rd floor, outside of E-301.</div><div><br></div><div>FS believes there is a leak in the water main pipe that runs along the 4th floor, and when any water source is turned on in the 4th floor, it causes the leak to start.</div><div><br></div><div>As a preventative measure, FS has closed the 4th floor bathrooms, as well, they have turned off the water at the sinks of the E-420 & E-422 labs.</div><div><br></div><div>FS is placing/installing water receptacles on the 3rd floor where the leaks have been occurring to catch any water that may leak overnight. </div><div><br></div><div>FS is working on the water main pipe issue and I will e-mail out an update as soon as I hear from them.</div><div><br></div><div>Thank you,<br clear="all"><div><div><div dir="ltr">Marcie Morihiro<br>Assistant to the Dean<br>College of Engineering<br>San Diego State University<br>5500 Campanile Drive<br>San Diego, CA 92182-1326<br><br>Office: E-203B<br>Phone: <a href="tel:619-594-6062" value="+16195946062" target="_blank">619-594-6062</a><br>E-mail: <a href="mailto:mmorihiro@mail.sdsu.edu" target="_blank">mmorihiro@mail.sdsu.edu</a><br></div></div></div>
</div></div>
</blockquote></div><br></div></div></div>