<div dir="ltr">Hi Everyone,<div><br></div><div>Facilities Services (FS) came out and assessed the problem of the leak on the 3rd floor, outside of E-301.</div><div><br></div><div>FS believes there is a leak in the water main pipe that runs along the 4th floor, and when any water source is turned on in the 4th floor, it causes the leak to start.</div><div><br></div><div>As a preventative measure, FS has closed the 4th floor bathrooms, as well, they have turned off the water at the sinks of the E-420 & E-422 labs.</div><div><br></div><div>FS is placing/installing water receptacles on the 3rd floor where the leaks have been occurring to catch any water that may leak overnight. </div><div><br></div><div>FS is working on the water main pipe issue and I will e-mail out an update as soon as I hear from them.</div><div><br></div><div>Thank you,<br clear="all"><div><div class="gmail_signature"><div dir="ltr">Marcie Morihiro<br>Assistant to the Dean<br>College of Engineering<br>San Diego State University<br>5500 Campanile Drive<br>San Diego, CA 92182-1326<br><br>Office: E-203B<br>Phone: 619-594-6062<br>E-mail: <a href="mailto:mmorihiro@mail.sdsu.edu" target="_blank">mmorihiro@mail.sdsu.edu</a><br></div></div></div>
</div></div>