<html xmlns:v="urn:schemas-microsoft-com:vml" xmlns:o="urn:schemas-microsoft-com:office:office" xmlns:w="urn:schemas-microsoft-com:office:word" xmlns:m="http://schemas.microsoft.com/office/2004/12/omml" xmlns="http://www.w3.org/TR/REC-html40"><head><META HTTP-EQUIV="Content-Type" CONTENT="text/html; charset=us-ascii"><meta name=Generator content="Microsoft Word 14 (filtered medium)"><style><!--
/* Font Definitions */
@font-face
{font-family:Helvetica;
panose-1:2 11 6 4 2 2 2 2 2 4;}
@font-face
{font-family:Helvetica;
panose-1:2 11 6 4 2 2 2 2 2 4;}
@font-face
{font-family:Calibri;
panose-1:2 15 5 2 2 2 4 3 2 4;}
@font-face
{font-family:Tahoma;
panose-1:2 11 6 4 3 5 4 4 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
{margin:0in;
margin-bottom:.0001pt;
font-size:12.0pt;
font-family:"Times New Roman","serif";}
a:link, span.MsoHyperlink
{mso-style-priority:99;
color:blue;
text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
{mso-style-priority:99;
color:purple;
text-decoration:underline;}
span.EmailStyle17
{mso-style-type:personal-reply;
font-family:"Calibri","sans-serif";
color:#1F497D;}
.MsoChpDefault
{mso-style-type:export-only;
font-family:"Calibri","sans-serif";}
@page WordSection1
{size:8.5in 11.0in;
margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
{page:WordSection1;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext="edit" spidmax="1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext="edit">
<o:idmap v:ext="edit" data="1" />
</o:shapelayout></xml><![endif]--></head><body lang=EN-US link=blue vlink=purple><div class=WordSection1><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D'><o:p> </o:p></span></p><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D'><o:p> </o:p></span></p><p class=MsoNormal><b><span style='font-size:10.0pt;font-family:"Tahoma","sans-serif"'>From:</span></b><span style='font-size:10.0pt;font-family:"Tahoma","sans-serif"'> Work Control Center [mailto:wcontrol@mail.sdsu.edu] <br><b>Sent:</b> Friday, January 03, 2014 9:48 AM<br><b>To:</b> Arlene Gibson; Helen Wyckoff; Marcie Morihiro; Sandy Maxwell<br><b>Subject:</b> Modification: Scheduled Campus Power Outage<o:p></o:p></span></p><p class=MsoNormal><o:p> </o:p></p><div><p class=MsoNormal><b>*MODIFICATION: The Engineering building is also included in this list but was left out of the initial email*</b><o:p></o:p></p><div><p class=MsoNormal style='margin-bottom:12.0pt'><br>Facilities Services is scheduling a series of power outages for the beginning of the new year. We will be performing preventive maintenance, testing, cleaning and calibration of the equipment on campus. Buildings with emergency generators may notice a brief outage when the utility power is dropped and the generator starts. Please remember to turn off any equipment that might be damaged by these outages on the dates your building is affected.<br><br>We apologize for any inconvenience and appreciate your continuing support of our efforts to maintain a safe campus environment. Please call the Work Control Center at <a href="tel:619-594-4754" target="_blank">619-594-4754</a>, or e-mail us at <a href="mailto:wcontrol@mail.sdsu.edu" target="_blank">wcontrol@mail.sdsu.edu</a> with any questions.<br><br>Below are the tentative dates, times and facilities effected:<o:p></o:p></p></div><p class=MsoNormal><b>Monday, January 6, 2014 – Starting at 10:00 p.m. through 6 a.m. Tuesday, January 7, 2014</b><br><br>SUB-STATION C and SUB-STATION D <b>Tuesday, January 7, 2014. Starting at 10 p.m., and lasting until 6:00 a.m. Wednesday, January 8, 2014</b><br><br>-AND-<br><br><b>Wednesday, January 8, 2014. Starting at 10 p.m. and lasting until 6:00 a.m. Thursday, January 9, 2014</b><br><br>SUB-STATION B<o:p></o:p></p><div><p class=MsoNormal><br>ADAMS HUMANITIES [emergency generator will run – selected loads only]<br>ATM KIOSK (NEAR EDUCATION)<br>AZTEC STUDENT UNION<br>CAMPUS CHILDREN'S CENTER<br>CUICACALLI EAST - TECUBO <br>CUICACALLI WEST - TEPEYAC <br>CUICACALLI CENTER [emergency generator will run – selected loads only]<br>E LOT NORTH <br>E LOT SOUTH <br>EBA - CHILLERS<br>EDUCATION & BUSINESS ADMIN. [emergency generator will run – UCO only]<br>F LOT <br>G LOT <br>H LOT <br>LOVE LIBRARY [emergency generator will run – selected loads only] (AT&T Cell Site, Cricket Cell Site)<br>LOVE LIBRARY ADDITION <br>MANCHESTER HALL <br>MONTY'S MARKET <o:p></o:p></p></div><p class=MsoNormal>O.A.T. GREEN ROOM <br>O.A.T. UPPER RESTROOM <o:p></o:p></p><div><p class=MsoNormal style='margin-bottom:12.0pt'>OPEN AIR THEATER<br>PARKING STRUCTURE 1 <br>PARKING STRUCTURE 3 [emergency generator will run – selected loads only]<br>PARKING STRUCTURE 6 [emergency generator will run – selected loads only]<br>STUDENT SERVICES EAST [emergency generator will run – selected loads only] (AT&T Cell Site)<br>STUDENT SERVICES WEST <br>TELEPHONE REMOTE #2 <br>TENOCHCA HALL [emergency generator will run – selected loads only] (AT&T Cell Site, Verizon Cell Site, Cricket Cell Site)<br>TULA HALL <br>ZURA HALL [emergency generator will run – selected loads only]<br><br> <o:p></o:p></p></div><p class=MsoNormal><b>Thursday, January 9, 2014. Starting at 10 p.m. and lasting until 6 a.m. Friday, January 10, 2014<br></b><br>-AND-<br><br><b>Friday, January 10, 2014. Starting at 10 p.m. and lasting until 6 a.m. Saturday, January 11, 2014<br><br></b><br clear=all>A LOT <o:p></o:p></p><div><p class=MsoNormal> <br>ADMINISTRATION [emergency generator will run – entire facility]<br>ART NORTH [emergency generator will run – selected loads]<br>ART SOUTH <br>ARTS AND LETTERS<br>AZTEC SHOPS BOOKSTORE <br>BIOSCIENCES ADDITION TO NLS [emergency generator will run – selected loads only]<br>CHEMICAL SCIENCE LABORATORY [emergency generator will run – selected loads only]<br>CHEMICAL STORAGE (T35) <br>COMPUTER APPLIED MECH <br>EAST COMMONS <br>EAST MALL <br>EDUCATION <br>ENGINEERING<br>ENGINEERING LAB <br>FACILIITES SERVICES BOILER SHOP <br>FACILITIES SERVICES <br>FACILITIES SERVICES GARAGE<br>FACILITIES SERVICES STORAGE (T25) QUONSET <br>FACULTY/STAFF CENTER <br>GEOLOGY MATH & COMPUTER SCIENCE <br>GROWTH CHAMBER [emergency generator will run – entire facility]<br>HARDY TOWER <br>HAZMAT BUILDING <br>HEPNER HALL <br>HOTDOGGER <br>INDUSTRIAL TECHNOLOGY <br>LIFE SCIENCE NORTH [emergency generator will run – entire facility] (Verizon Cell Site)<br>LIFE SCIENCE SOUTH [emergency generator will run – entire facility]<br>LOWER A-LOT SIGN<br>NASATIR HALL <br>NORTH EDUCATION - 60 <br>NORTH EDUCATION <br>PARKING STRUCTURE 8<br>PHYSICAL SCIENCES <br>PHYSICS <br>PHYSICS-ASTRONOMY <br>PROFESSIONAL STUDIES & FINE ARTS [emergency generator will run – selected loads]<br>RADIATION WASTE (T13) <br>SCIENCES FAC OFFICE (T12) <br>STORM HALL <o:p></o:p></p></div><p class=MsoNormal style='margin-bottom:12.0pt'><br clear=all><br>-- <br>Work Control Center<br>Department of Facility Services<br>San Diego State University<br>P: 594-4754 F: 594-1711<br><span style='font-family:"Helvetica","sans-serif";color:black'><a href="http://go.sdsu.edu/facilitiesservices/" target="_blank">sdsu.edu/fs</a><br><a href="http://www.facebook.com/SDSUFacilitiesServices" target="_blank">www.facebook.com/SDSUFacilitiesServices</a></span><o:p></o:p></p></div></div><br />--
<br />This message has been scanned for viruses and
<br />dangerous content by
<a href="http://www.mailscanner.info/"><b>MailScanner</b></a>, and is
<br />believed to be clean.
</body></html>